Brainerd Lakes General Aviation Terminal Building
Mead & Hunt provided design services to renovate and expand Brainerd Lakes Regional Airport’s general aviation terminal building.
Brainerd Lakes General Aviation Terminal Building Read More »
Mead & Hunt provided design services to renovate and expand Brainerd Lakes Regional Airport’s general aviation terminal building.
Brainerd Lakes General Aviation Terminal Building Read More »
The facility now collects biogas from dairy manure, cleans and compresses it to pipeline-quality standards, and injects it directly into a pipeline.
Wisconsin Multi-Farm RNG Facility & Central Upgrading Plant Read More »
Our team provided engineering, procurement, and construction services to provide a new membrane treatment system to convert methane to renewable natural gas.
Waste-to-Energy RNG Digester Facility with Solar Microgrid Read More »
Kerry, Inc. needed to improve water use efficiency in their manufacturing facility to reach sustainability targets. Our team helped them save ~40,000 gallons/day.
Design-Build Water Reduction and Reuse Read More »
We helped this wastewater treatment plant construct a biogas conditioning system to fuel its fleet of city buses.
Municipal Wastewater to CNG-Powered Vehicle Fleet Read More »
Immediate repairs were needed to keep the historic Mississippi River Bridge, a vital link between Minnesota and Wisconsin, open to traffic.
This client needed to install a system that would enable upgraded landfill gas to be injected into a utility natural gas pipeline.
Illinois Landfill Gas-to-RNG Facility Read More »
Our team connected biogas lines from existing digesters at three dairy farms to a central biogas treatment system.
Farm Digester Cluster Renewable Natural Gas System Read More »
Quality doesn’t just happen. It must be carefully planned into every project, from inception through design and construction.
The Minutemen Causeway stormwater project reduces nutrient loading for the Indian River Lagoon. The causeway treats stormwater from an 8.34-acre watershed by using Low-Impact Design BMPs.
Cocoa Beach Minutemen Causeway Stormwater & Streetscape Improvements Read More »