Skip to content
Horizontal-logo
  • 125 Years of Exceptional
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Events
  • Careers
  • 125 Years of Exceptional
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Events
  • Careers

Challenging Bulkhead Design: Dam Closure System at Broken Bow and Hugo Lakes

  • September 26, 2017
Sideview of Broken Bow Dam

Tulsa District of the U.S. Army Corps of Engineers would like to replace the bulkheads at Broken Bow and Hugo Lakes. These bulkheads are used to block water from flowing through the tainter gate bays when the tainter gates are serviced or inspected.

In 2015, the Mead & Hunt team analyzed the feasibility of multiple gate closure systems and provided a life-cycle cost for each system. The project was a great opportunity for my team to demonstrate our dam safety expertise on a large USACE project. The final report recommended Tulsa District procure a single segmental bulkhead to be used at both lakes.

Segmental bulkhead designs are widely used as a closure system. They have the advantage of being fully shop-fabricated with relatively light sections that can be removed from the water with a medium-sized crane. Assembly of a segmental bulkhead in the water requires proper alignment of bulkhead sections followed by fastening the sections together in a safe and reliable manner.

Last year, the district issued a task order to our Mason & Hanger and Mead & Hunt Joint Venture. We were asked to provide a preliminary design and cost estimate for a single segmental bulkhead system to be used at two dams. Our design had to include storage locations and each lake and launch locations for the bulkhead system.

The scope of work included a number of design constraints:

  • No divers could be employed for assembly or placement of the bulkhead
  • Use of only one crane for loading, unloading and assembly
  • Minimize the number of personnel required to transport, mobilize and demobilize
  • A six-foot operating reservoir level range at each project
  • Challenging geometry at one of the launch sites

Our team used an iterative design approach that satisfied the design constraints. We varied the external dimensions and wall thickness of the bulkhead segments until a design for the segmental bulkhead system was achieved.

The resulting segmental bulkhead consists of individual segments that when joined constitute a bulkhead floating in a horizontal orientation. The bulkhead can be ballasted to rotate to a vertical orientation for placement at the upstream end of a spillway bay. Different combinations of the segments can be assembled to produce a bulkhead for use at both lakes.

The segments will be joined using pin and socket joints, tension connectors and flange bolts. These connection systems have a tolerance for misalignment as the segments are moved together. In addition, the systems permit assembly personnel to remain clear of pinch points during assembly. No divers are required for assembly or placement of the bulkhead.

Launch access at both lakes was considered, to allow the use of the district’s crane. Part of the design included developing a crane pad that limited the required crane radius and allowed deployment and recovery of the designed bulkhead segments.

Last week we submitted the final 65 percent design. I’m looking forward to working with Tulsa District to complete the design and see this system constructed and placed into operation. This exacting project has helped me hone my skills as a project manager and engineer.

I would love to discuss this very interesting dam closure system design project with you. I’ll be at the Society of American Military Engineers Federal Small Business Conference in Pittsburgh from November 15-17. Come visit me at Mead & Hunt booth #712.

Miro Kurka headshot

Miro Kurka, PE, PMP

Miro knows water is an incredible resource. “I like leading teams and managing water infrastructure projects that make our citizens safer, wealthier and happier.” He is the recipient of the 2019 SAME Individual Industry Government Engagement Award. A retired U.S. Army officer, Miro managed the Corps of Engineers’ program in Tulsa, Portland and Afghanistan for 30 years. He enjoys traveling and meeting people.

Linkedin Envelope Readme
PrevPrevious
NextNext

Most Popular

Nicki Combs Named President-Elect of ACRA
September 10, 2025
A Glimpse into History: Why Jelly Juice Jars Were Found in Virginia Schoolhouses
August 26, 2025
Transportation Impact Fees: How Developer Contributions Support Healthier Communities
August 20, 2025
80 Years of Planning and Building Our Nation’s Military Aviation
August 19, 2025

Main Menu

  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers
  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers

Useful Links

  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage
  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage

Get in touch

  • Apply Today
  • Contact Us
  • Locations
  • Title VI
  • Apply Today
  • Contact Us
  • Locations
  • Title VI

Connect with us

Linkedin Facebook Instagram Vimeo

© 2025 Mead & Hunt, Inc. All rights reserved.

[uc-privacysettings] | Privacy & CCPA Policy | Do Not Sell | Site Map
This website uses cookies to improve your experience. Read full privacy policy
ACCEPTREJECTSETTINGS
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
Powered by CookieYes Logo