Challenging bulkhead design: Dam closure system at Broken Bow and Hugo Lakes

Tulsa District of the U.S. Army Corps of Engineers would like to replace the bulkheads at Broken Bow and Hugo Lakes. These bulkheads are used to block water from flowing through the tainter gate bays when the tainter gates are serviced or inspected. In 2015, the Mead & Hunt team analyzed the feasibility of multiple gate closure systems and provided […]

Challenging bulkhead design: Dam closure system at Broken Bow and Hugo Lakes Read More »