To support mission-critical training operations and improve electrical system reliability, the Michigan Air National Guard’s Alpena Combat Readiness Training Center (CRTC) undertook a major modernization of its aging electrical distribution infrastructure. The existing overhead system, more than 40 years old, was vulnerable to weather-related outages and wildlife interference, creating operational risks for the installation.
Mead & Hunt provided planning, surveying, engineering, and construction support services to transition the base from an overhead distribution network to a modern underground electrical system. The project included installation of new primary distribution lines in concrete-encased duct banks, replacement of aging transformers and switching equipment, upgrades to underground electrical infrastructure, and conversion of overhead secondary services to underground distribution.
To maintain safety and visibility throughout the installation, the project also included a complete replacement of site lighting with energy-efficient fixtures designed to meet Department of Defense standards. Construction was strategically phased to minimize disruptions to military training activities and allow the CRTC to maintain operations throughout implementation.
The completed project significantly improved system reliability, resiliency, and maintainability while providing a modern electrical infrastructure platform capable of supporting the installation’s long-term mission requirements.