Skip to content
Horizontal-logo
  • 125 Years of Exceptional
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Events
  • Careers
  • 125 Years of Exceptional
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Events
  • Careers
I-94 and CTH T interchange in St. Croix
IH 94 and CTH T interchange with dual roundabouts

Wisconsin IH 94 & CTH T Interchange Reconstruction

  • CLIENT: Wisconsin Department of Transportation
  • LOCATION: St. Croix County, WI

Interchange construction accommodates closure concerns

Significant traffic growth and crumbling infrastructure required the reconstruction of 1.5 miles of the IH 94 and CTH T interchange. Improvements included dual roundabouts, lengthened ramps and reconstruction of an existing structure to increase capacity and improve safety. A Park & Ride facility was also added to help reduce traffic and carbon emissions.

Our team successfully addressed concerns about roadway closure during construction. After getting stakeholder input, we developed a four-stage traffic control plan that limited impacts to the traveling public when possible. We followed the public’s suggestions regarding the best dates for a short 21-day highway closure during the 230-day construction period.

Another challenge regarded acceptance of our dual roundabout design that was selected to improve safety and increase traffic flow. At a special meeting, we showed how agricultural and warehousing vehicles would navigate the roundabouts. The reconstructed entrance and exit ramps are designed to coordinate with the future expansion of IH 94 from four existing to six lanes.

Key Project Aspects

-

1.5 mile reconstruction

-

4-stage traffic control plan

-

Dual roundabouts

-

Future expansion ready

-

Park & Ride facility

-

Public involvement

Video

Relevant Projects

Loading...
USH 12 intersection modification aerial

USH 12 & Park Street Interchange in Wisconsin

Taliesen house

Wisconsin Highway 23 Section 106 Compliance

Wisconsin Highway 29 Roadway and Bridge Design

Wisconsin Highway 29 Roadway & Bridge Design

Main Menu

  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers
  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers

Useful Links

  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage
  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage

Get in touch

  • Apply Today
  • Contact Us
  • Locations
  • Title VI
  • Apply Today
  • Contact Us
  • Locations
  • Title VI

Connect with us

Linkedin Facebook Instagram Vimeo

© 2025 Mead & Hunt, Inc. All rights reserved.

[uc-privacysettings] | Privacy & CCPA Policy | Do Not Sell | Site Map
This website uses cookies to improve your experience. Read full privacy policy
ACCEPTREJECTSETTINGS
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
Powered by CookieYes Logo