Skip to content
Mead & Hunt logo
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
Mead & Hunt logo
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
a rendering of the exterior of Hector International Airport with large F-A-R letters in front of the terminal
a rendering of an aerial view showing the completed Hector International Airport with 9 gates
a rendering of the ticketing area at Hector International Airport
A rendering of Gate 6 at Hector International Airport
rendering showing the interior of Hector International Airport including stairs, an escalator, and a model biplane hanging above.
rendering showing the interior of Hector International Airport

Hector International Airport Terminal

  • CLIENT: Hector International Airport (FAR)
  • LOCATION: Fargo, ND

Phased Terminal Expansion Meets Current and Future Needs

Hector International Airport (FAR) needed a terminal expansion that would support airport growth. Mead & Hunt provided the design for this necessary project.

The phased project includes a four-gate, 81,000-square-feet addition and a five-gate, 112,175-square-feet existing building renovation. There will be nine gates total upon completion. The project includes reconfiguring interior spaces, updating/replacing finishes and updating building systems in the existing terminal, and construction of the terminal expansion.

Crucially, the airport needs to maintain the operation of five gates at all times throughout construction. The existing security checkpoint will be relocated to maintain operation during airport public hours, and our team will work with a TSA-approved contractor to coordinate the relocation once the new space is ready. Phasing was developed with the intent of minimizing disruptions to existing operations and keeping all five gates open throughout construction.

Key Project Aspects

-

4-gate, 81,000-SF addition

-

5-gate, 112,175-SF renovation

-

3-phased approach

-

9 gates total

Relevant Projects

Loading...
passenger seating at Fort Wayne International Airport

Fort Wayne International Airport Terminal Expansion

exterior of the Eastern Iowa Airport at dusk

Eastern Iowa Airport Terminal Design

Appleton International Airport living wall

Appleton International Airport Net Zero Terminal Building Renovations

Main Menu

  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers
  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers

Useful Links

  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage
  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage

Get in touch

  • Apply Today
  • Contact Us
  • Locations
  • Title VI
  • Apply Today
  • Contact Us
  • Locations
  • Title VI

Connect with us

Linkedin Facebook Instagram Vimeo

© 2026 Mead & Hunt, Inc. All rights reserved.

Privacy Settings | Privacy & CCPA Policy | Do Not Sell | Site Map