Madison Water Utility Operations Building
The new Madison Water Utility Operations Center meets the city’s goals of increased safety, sustainability and urban renewal.
Madison Water Utility Operations Building Read More »
The new Madison Water Utility Operations Center meets the city’s goals of increased safety, sustainability and urban renewal.
Madison Water Utility Operations Building Read More »
Mead & Hunt’s redesign of the existing Madison Water Utility Operations Center redeveloped an urban site, which then required stormwater treatment.
Madison Water Utility Site Redevelopment Read More »
Tulsa District of the U.S. Army Corps of Engineers would like to replace the bulkheads at Broken Bow and Hugo Lakes. These bulkheads are used to block water from flowing through the tainter gate bays when the tainter gates are serviced or inspected. In 2015, the Mead & Hunt team analyzed the feasibility of multiple gate closure systems and provided
Challenging Bulkhead Design: Dam Closure System at Broken Bow and Hugo Lakes Read More »
In planning a taxiway relocation, Roseburg Regional Airport needed to improve safety by extending the culvert through which Newton Creek crossed under the existing taxiway.
Newton Creek Relocation & Fish Passage Read More »
The Portland Air National Guard operates under a National Pollutant Discharge Elimination System Permit to protect water quality.
Portland ANGB Water Quality System Read More »
Five areas in central California have a combined population of 4,500 residents who depend on the CPUD to supply them with good quality potable water.
Jeff Davis Water Treatment Plant Read More »
Mead & Hunt assists the City of Hastings with critical monitoring, reporting and inspections for their water and wastewater treatment plants.
Hastings Water & Wastewater Treatment Contract Operations Read More »
As part of the USACE commitment to reducing its carbon footprint by decreasing greenhouse gas emissions, the Tulsa District wanted to learn if its John Redmond Dam was a good candidate for adding hydropower.
John Redmond Dam Hydro Feasibility Study Read More »
Mead & Hunt conducted a study on the feasibility of temporary gate closure systems and provided recommendations for Broken Bow & Hugo Lake.
Broken Bow & Hugo Lake Closure Structure Study & Design Read More »
Mead & Hunt prepared Preliminary Engineering Reports and subsequent Rural Development funding applications for a $2.8 million water project and an $8.3 million wastewater project.
Norway Water and Wastewater System Improvements Read More »