As part of a multi-phase terminal expansion program, Mead & Hunt modernized Fort Wayne International Airport’s Central Utility Plant (CUP) to support terminal growth while improving energy efficiency, reliability, and operational resiliency. The upgrades increased utility capacity and created a flexible foundation for future airport development.
The project replaced aging plant equipment, including hot water boilers, heat exchangers, water-cooled chillers, pumps, cooling towers, and emergency power infrastructure. Mead & Hunt also implemented a new electrical distribution configuration and standby generation system to maintain critical airport operations during utility outages.
To improve energy performance and reduce operating costs, the team expanded the airport’s thermal energy storage capacity to 2,400 ton-hours. The chilled-water plant was configured to melt stored ice while simultaneously operating a 365-ton ice-making chiller for chilled-water production, supplemented by two 300-ton water-cooled chillers. This configuration allows cooling production to be shifted away from peak utility demand periods while providing redundancy to maintain chilled-water service during equipment outages.
The result is a modern, resilient CUP that efficiently delivers heating, cooling, and backup power while supporting the airport’s continued growth and long-term operational needs.