Mead & Hunt designed a resilient medium-voltage electrical distribution system to support two new airport concourses and a remote Central Utility Plant (CUP), while integrating with the existing airport’s electrical infrastructure. As part of the project, the airport’s existing 5-kV electrical service was upgraded to a new 25-kV distribution system, increasing system capacity, improving reliability, and allowing the airport to expand in the future.
Working closely with the local utility provider, Mead & Hunt implemented a 25-kV main-tie-main automatic transfer switchgear system served by two independent utility feeds. This configuration provides source redundancy and allows the electrical system to maintain service during the loss of a single utility source while reducing reliance on standby generation.
The medium-voltage distribution network was coordinated with phased concourse construction and designed to support future airport expansion. The result is a flexible, scalable, and resilient power distribution system capable of adapting to the airport’s long-term electrical needs.