Skip to content
Mead & Hunt logo
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
Mead & Hunt logo
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Commissioning
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Mead & Hunt Foundation
  • Careers
Tourist park dam
TouristParkDam760x540
TouristParkDam3-760x540
TouristParkDam2-760x540
TouristParkDam1-760x540

Tourist Park Dam Environmental Restoration

  • CLIENT: Marquette Board of Light And Power
  • LOCATION: Marquette, MI

Mitigating a disaster and restoring a community resource

After a flood breached the Tourist Park Dam in 2003, its delayed reconstruction led to vegetation filling the empty reservoir. Submission of a wetland permit application appeared to be the last hurdle to rebuilding.  In contrast to earlier reviews, the agencies required compensation for the newly formed wetlands within the reservoir limits. Our environmental scientists performed a late-season wetland delineation that brought the apparent impacts down to 11.6 acres and secured the permit.

We negotiated lower mitigation ratios and use of the Tourist Park reservoir as an appropriate mitigation site. Our planners designed a mitigation plan to provide 14.4 credits, based on restoration of aquatic bed, emergent and shrub wetlands and a large riparian conservation easement. The plan included grading plans, soil amendments, plantings, seedings and erosion controls as well as invasive plant controls and wetland performance standards and monitoring format.

Key Project Aspects

-

11.6 acre impacts

-

Mitigation plan

-

Wetland permit secured

quotation marks

We were stuck in a very difficult permitting situation for re-building our flood-damaged dam...the Mead & Hunt turned the situation around with an accurate, rapid and extremely professional mitigation plan that’s saved our project timetable and allowed us to recover our investment.

Erik Booth, Utility Compliance Manager, Marquette Board of Light and Power

Relevant Projects

Loading...
Montello Dam

Montello Dam Reconstruction

Sideview of Mahoning Creek Dam

Mahoning Creek Hydroelectric Project

Sugar Creek Wetlands surrounded by landscape

Sugar Creek Wetland Mitigation Site

Main Menu

  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers
  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers

Useful Links

  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage
  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage

Get in touch

  • Apply Today
  • Contact Us
  • Locations
  • Title VI
  • Apply Today
  • Contact Us
  • Locations
  • Title VI

Connect with us

Linkedin Facebook Instagram Vimeo

© 2026 Mead & Hunt, Inc. All rights reserved.

Privacy Settings | Privacy & CCPA Policy | Do Not Sell | Site Map