Skip to content
Horizontal-logo
  • 125 Years of Exceptional
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Events
  • Careers
  • 125 Years of Exceptional
  • Markets
    • Aviation
    • Cultural Resources
    • Education
    • Federal
    • Food & Beverage
    • Justice
    • Renewable Energy
    • State & Local
    • Transportation
    • Water
  • Services
    • Architecture & Interiors
    • Construction Services
    • Engineering
    • Environmental
    • Fabrication & Custom Manufacturing
    • Planning
    • Sustainability & Resilience
    • Technology & Security
  • Portfolio
  • News
  • About
    • Purpose & Values
    • Meet Our Team
    • Inclusion & Belonging
    • Corporate Responsibility
    • Locations
    • Scholarship Opportunities
    • Our History
    • Events
  • Careers
trucks unloading at a station

RNG Truck Unloading Facility Expansion

  • CLIENT: Diversified Energy Company (Confidential)
  • LOCATION: Newton, WI

Expansion Increased RNG Truck Unloading Capacity

This diversified energy company needed to expand its high-pressure renewable natural gas (RNG) truck unloading facility to accept an increasing RNG volume coming from farms throughout Wisconsin. Having served as Owner’s engineer for the initial system design and construction in 2018, our team seamlessly transitioned to the engineering, procurement, and construction (EPC) contractor to deliver this turnkey expansion of the unloading (decanting) area. We designed and constructed the RNG unloading system processes, which included in-house fabrication of a glycol heating skid which warms the RNG and a RNG valve skid. The system controls RNG flow, temperature, and pressure while monitoring BTU, hydrogen sulfide (H2S), water (H2O), oxygen (O2), and carbon dioxide (CO2) content to maintain pipeline-quality RNG and meet interconnect requirements. Additionally, we provided an updated control system, tied in new piping, erected an equipment building, and installed two truck bays at each station. The project increased the RNG decanting/truck unloading facility capacity by 67%. A large farm sends a truck daily to unload, and five trucks can unload at one time into the 975-psi utility pipeline.

Key Project Aspects

-

67% increase in unloading capacity

-

Five bays for 3,600 psi RNG

-

975 psi utility pipeline

Relevant Projects

Loading...
outdoor view of a Biogas Treatment System at a midwest dairy farm

Farm Digester Cluster Renewable Natural Gas System

Gas boilers in gas boiler room

Landfill Gas Treatment Evaluation and Design

aerial view of building

Wisconsin Multi-Farm RNG Facility & Central Upgrading Plant

Main Menu

  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers
  • Home
  • Markets
  • Services
  • Portfolio
  • News
  • About
  • Careers

Useful Links

  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage
  • Ebids
  • Corporate Responsibility
  • Equipment & Parts
  • GSA Schedules Program
  • Government Contract Vehicles
  • Policy for Third-Party Recruiters
  • Transparency in Coverage

Get in touch

  • Apply Today
  • Contact Us
  • Locations
  • Title VI
  • Apply Today
  • Contact Us
  • Locations
  • Title VI

Connect with us

Linkedin Facebook Instagram Vimeo

© 2025 Mead & Hunt, Inc. All rights reserved.

[uc-privacysettings] | Privacy & CCPA Policy | Do Not Sell | Site Map
This website uses cookies to improve your experience. Read full privacy policy
ACCEPTREJECTSETTINGS
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.
Necessary
Always Enabled
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.
Functional
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytics
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.
Others
Other uncategorized cookies are those that are being analyzed and have not been classified into a category as yet.
SAVE & ACCEPT
Powered by CookieYes Logo