Mead & Hunt provided engineering design and bid documents for a behind-the-meter demonstration microgrid at a City of Madison fire station operating as a 24/7 Grid-Interactive Efficient Building (GEB) pilot facility. Designed to enhance energy resilience and operational continuity, the microgrid enables the facility to maintain critical services during utility disruptions while optimizing energy use under normal conditions.
The project paired a 25-kW/100-kWh battery energy storage system (BESS) with the existing 100-kW solar photovoltaic (PV) array and backup generator and added advanced power monitoring infrastructure. Mead & Hunt developed an energy management strategy that coordinates these resources to maximize system performance in both grid-connected and islanded operating modes.
A key microgrid feature is its ability to prioritize and manage facility loads based on available energy resources. The system can support full facility operations during short-term outages. When resources are limited, it automatically sheds non-critical loads and restores them once solar generation or other generation resources become available. Detailed lifecycle and resiliency analyses evaluated multiple battery storage durations to optimize project value within budget constraints.
By combining renewable energy and battery storage under intelligent controls, the City of Madison gained a resilient, flexible energy solution that improves reliability and reduces peak-demand impacts. The project also demonstrates the future of municipal microgrid and grid-interactive building technologies.
