Food manufacturing and distribution center receives upgrade

When our food processing and distribution client approached us about designing fast-tracked utility services for their campus, our team rose to the challenge. We finished the design in three months and construction in nine months.

The facility includes food receiving, cooking preparation, packaging and shipping areas for the distribution of fresh food like pizza, sandwiches, soups and sushi to their storefronts across southern California. Our team included two separated ammonia-fed chilled water systems at different design temperatures within the mechanical utility system. The HVAC system design included sanitary food grade custom air handling units.

In addition to our systems work, Mead & Hunt brought our structural engineers to the table to help design a pedestrian bridge spanning two buildings. This 140-foot bridge serves dual purposes: safe passage for workers over a working road, and structural support for ammonia piping routed from building to building.

Project

Food Processing Facility and Distribution Center

Client

Confidential

Expertise Provided

Food & Beverage

Location

Western United States